Phase 1: Almost Complete
I spent a little over 8 hours doing yard work on Saturday. Right now everything on my backside from the top of my shoulders to the heels of my feet hurt. And my reward? Three leveled, mulched flower beds. Only one more bed left to take care of – the raised vegetable bed (which I still need to build), then Phase 1 of my Master Plan for the backyard will be complete. The next phase in the plan is to build one large stone patio & some walkways. My goal is to finish them all before we open the pool in June.
Wow, 8 hrs is pretty long time to garden. I think I have a black thumb and would probably kill flowers. I have thought about trying to do a veggie garden in a box since we cant plant anything in the ground. Not sure I would be able to get things to grow though.
When you get everything done I would like to come see it!
Im sure it will be beautiful, and peaceful.
Love you!